- Flat Packs....ship FAST ...save time and $$$ flat packs get shipping priority.
- Builder's Project Advantage save down time and site costs... we can usually supply your prelims ( tracks, supports etc within a few days of order....followed up by a fast production of the shutters delivered to site.
- Home Builders Discount Save on install....this is a great way to affordably compliment your home project and have the satisfaction ofyour own DIY install.
All self installs come with standard fixings and instructions....and we will be there for for you on any technical queries also.
Flat Packs
What does a flat pack include?
-
Ready cut components/stiles with pre-punched rail connection holes and
end caps already attached, cut-to-size and assembled within gearing system
with spring loaded bosses
- Cut-to-size blades
- Rails included with frame-joining corner stakes (if required)
- Fixing screws and all components to build frame
- Cover caps, blade profile end caps and screw cover caps
- Optional hardware/accessories if ordered (EEG: Key Locks, Magnet Catches, etc)
All individual material is protectively plastic skin wrapped and packed in
cupboard foamed shipping boxes with assembly instructions and optional hardware
if ordered.
Why order a flat pack?
-
Quick Shipment - about half the production lead times
- Competitive Price - for retailers who have a small facility for assembling.
Great for the project builder with some space to assemble on site and enjoy
a good margin or discount.
- Shorter Production Time - means goods to site quicker!
How long would it take to assemble the shutters myself?
1sqm takes approximately 20 minutes to assemble by a competent assembler at
our factories so allow about 30 minutes for a handy person on site or at the
back of the shop.
How do I place an order?
To place an order or to acquire more information about this great product,
please call 02 9381 2882.